Picture of Alfred Nakache municipal swimming pool - Auteur inconnu - © Creative Commons (https://creativecommons.org/licenses/by-sa/4.0/deed.fr) Picture of Alfred Nakache municipal swimming pool - Auteur inconnu - © Creative Commons (https://creativecommons.org/licenses/by-sa/4.0/deed.fr) Picture of Alfred Nakache municipal swimming pool - Caroline Léna Becker - © Creative Commons (https://creativecommons.org/licenses/by-sa/4.0/deed.fr) Picture of Alfred Nakache municipal swimming pool - Auteur inconnu - © Creative Commons (https://creativecommons.org/licenses/by-sa/4.0/deed.fr)

Toulouse : Alfred Nakache municipal swimming pool

Haute-Garonne

Reference

PA00125573

Latitude

43.585442

Longitude

1.435944

Address

5 Esplanade Georges Vallerey 31400 Toulouse

Construction era

2e quart 20e siècle

Protection date

1993/09/21 : inscrit MH

Protection cause

Ensemble sportif tel qu'il figure sur le plan annexé à l'arrêté (cad. AH 3) : inscription par arrêté du 21 septembre 1993

Description

The swimming pool, open both in summer and in winter, is part of an area of 25 hectares of sports, whose project was approved by the socialist municipality in 1931. It was designed by the municipal architect Jean Montariol and the engineer Charles BARUTEAUD. The park includes three summer pools: a hygiene basin, one for children and a sports pool, with stands that can accommodate 2,000 spectators. These basins are connected to a large central building containing undress and showers. This building also houses two winter basins, a village hall and a physical education institute comprising two gymnasiums. The management of the project was first allocated to the Public Office of Bon Marché dwellings in Toulouse, then was taken directly by the municipality. The construction work was carried out by the Toulouse carpenters under the direction of Paul Barthe. The entrance portico, known as "minaret", was produced by the architect Robert Armandary in 1931. The summer swimming pool was inaugurated this same year, while the winter swimming pool building was opened in 1934. The decoration of the building includes sculptures of Parayre and Manau, as well as a allegory of flammmed sandstone sports produced by Riollet. The construction of the stadium was launched in 1938, but the work was suspended due to the war and was not completed until 1952, under the direction of Émile Aillaud, architect designated by the Ministry of Sports.

Close monuments