Châtellerault : Henri IV bridge
VienneReference
PA00105404
Latitude
46.816452
Longitude
0.539262
Address
1 Pont Henri Iv 86100 Châtellerault
Construction era
4e quart 16e siècle;1er quart 17e siècle
Protection date
1913/11/15 : classé MH
Protection cause
Pont Henri IV : classement par arrêté du 15 novembre 1913
Description
Built between 1565 and 1609, and finished thanks to Sully which was often present in Châtellerault, the bridge consists of eight arches over a length of 144 meters, with two large towers on each side of its entrance on the left bank of Vienne. It has a flat apron 21 meters wide, equipped with very high sidewalks.